The FC is really coming together. More recently, we had some fitment issues with the intake pipe of the 20b motor in the FC. The 20b pipe runs flat and forward, causing some hood clearance issues. Linh worked his fabrication skills and took the new pipe, cut it and re-welded it at a new angle. …
ContinueAdded by JER Development on October 29, 2011 at 5:23pm — No Comments
Added by JER Development on October 29, 2011 at 3:58pm — No Comments
Today Mike was able to bring in his SE-R to have the coil sleeves installed so he can get that low stance he's been wanting.
The only small modification that had to be done was to grind down the piece shown above, so the coil sleeve can fit.…
ContinueAdded by JER Development on October 15, 2011 at 4:30pm — No Comments
14905 Dillow St,
Westminster, CA 92683
Phone: (714) 890-9207
Fax: (714) 903-0604
Email: JERDevelopment@yahoo.com
Monday-Friday
9:00am-6:00pm
Saturday
9:00am-6:00pm
Sunday
Closed
© 2024 Created by JER Development. Powered by